Bid exclusions and clarifications: a free checklist for contractors
A bid without a written exclusions list leaves the customer free to assume everything is included. Then the argument happens halfway through the job, when you find rot behind the wall or the inspector asks for something that wasn’t on the plans. Here are the exclusions and clarifications worth considering on every bid, grouped so you can scan them in a minute.
The checklist
Site and existing conditions
- Hidden conditions behind walls, under floors or below grade (rot, mold, old wiring, buried debris); priced by change order if found
- Rock, ledge, groundwater or unsuitable soil
- Survey, property line staking and soil testing
- Removal of hazardous materials (asbestos, lead paint) and any testing for them
Permits, fees and design
- Permit, plan review and inspection fees (state whether included or billed at cost)
- Engineering, architectural drawings and stamped plans
- Utility company connection, tap and impact fees
- Upgrades an inspector requires beyond the plans you bid
Scope edges
- Painting, patching or finish work outside the work area
- Moving or reinstalling furniture, appliances, fixtures or the owner’s belongings
- Landscaping, lawn repair and driveway or sidewalk damage from deliveries
- Owner-supplied materials: their delivery, damage, warranty and any delay they cause
Price and schedule
- Material price increases after a stated date (say how long the price holds, for example 30 days)
- Overtime, weekend or after-hours work the owner asks for
- Winter conditions: heating, tenting, snow removal and frozen-ground work
- Delays caused by the owner, other trades, utility companies or late selections
Cleanup and disposal
- Dumpster and disposal fees above an included allowance
- Final professional cleaning (broom-clean is included, if that is what you mean)
How to use it without scaring the customer off
- Only list what applies. Twenty generic exclusions on a bathroom remodel reads like you’re hiding something. Pick the five or six that could really come up on this job.
- Say what happens if it comes up. “Hidden rot is excluded” sounds harsh. “If we find rot behind the tile, we’ll show you and price the repair on a change order before we fix it” sounds like a plan.
- Put it on the same page as the price. Exclusions buried in fine print get skipped. Put them right under the scope, before the signature line.
- Use allowances for unknowns you can estimate. For example, a stated allowance for disposal or tile, with the rule that overages and credits are settled by change order.
This is a general checklist, not legal advice. Contract and home-improvement rules vary by state; check your state’s licensing board and have an attorney review your proposal and contract forms.
Want it built into your bid paperwork?
The Contractor Bid Kit includes a scope and exclusions checklist, a proposal template (PDF and Word) with an exclusions section, a fillable change order, an estimate and takeoff worksheet, a progress payment schedule, bid follow-up scripts and an Excel bid calculator. $49 one-time. This page stays free either way.
Get the Contractor Bid Kit — $49 Free change order formTemplates and worksheets, not legal, tax or accounting advice. Contract, licensing, deposit, retainage, lien and notice rules vary by state: check your state licensing board and local lien rules, and have an attorney in your state review your contracts before you use them. No guaranteed results.